Friday 9 October 2009

Work starts on the Trackwork

This is a photo of the first piece of pointwork to be constructed, it is a double cross over made from Peco Individulay in flat bottom rail. On our layout we are having flat bottom on the main line and loop with bull head in the shunting yard and colliery line.

No comments:

Post a Comment