This is the first mock up of the signal box, it is based on Aberthaw box. the box is sitting on the old up platform which is now out of use.
Saturday, 21 May 2011
Goods shed
Landscaping on the finished bridgeboard
Friday, 22 January 2010
The Bridge Board takes shape
Thursday, 19 November 2009
Work continues with Bridge board
Over the last few weeks we have been building parts of the bridge board. It is a complex design and has taken longer to design than previously thought. There are 3 major features to the Board, a railway bridge, a road bridge and the river. They are all at different angles and gradients. These are a few photos to show the proportions of the design.
Sunday, 18 October 2009
Subscribe to:
Posts (Atom)